The Problem
One of two parallel, 1200mm wide conveyors at Drax Power Station, used to discharge de-sulpharised gypsum into rail wagons for transport to British Gypsum.

The equipment is approximately two/three years old and was specifically designed for this purpose.
These were considered to be two of the more problematic conveyors at Drax since product recirculation was continually falling into the connecting mechanisms of the rail wagons, thus causing external maintenance problems.
QUOTE FROM NATIONAL POWER
" A major improvement on previous belt cleaning systems, I would have no hesitation in recommending the SMART Conveyor Belt Cleaning System to anyone considering fitting such equipment."

CKS SUPPLIES LIMITED
6 SHILDON GROVE, MOORENDS, DONCASTER,
SOUTH YORKSHIRE, DN8 4RA, ENGLAND, UK
Tel: +44(0)1405 741 455 || Mobile: +44(0)7704 856 392

email: enquiries@ckssupplieslimited.co.uk

contact site administrator
mondave Mondave